Why cost professionals belong in design meetings, not downstream from them

We caught a significant budget issue at design development that would have been a substantial change order at construction. Here's how our integrated model flagged it early.

Previous
Previous

Before we draw a line, our civil engineer has already modelled the site in 3D

Next
Next

The questions owners are most afraid to ask are usually the most important ones